Genie SUPERLIFT 33547 User Manual Page 14

  • Download
  • Add to my manuals
  • Print
  • Page
    / 26
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 13
12 Genie Superlift Contractor Part No. 33547
Operator's Manual First Edition • Ninth Printing
FUNCTION TESTS
Test One-Speed Winch Operation
1 Install a load handling attachment.
2 Raise the carriage by
firmly grasping the
winch handles and
rotating them towards
the mast.
Result: The winch
should operate
smoothly, free of
hesitation or binding.
3 Lower the carriage by firmly grasping the winch
handles and rotating them away from the mast.
After lowering to the desired position, turn the
winch handles toward the mast (raise the load)
1
/4 turn to set the brake.
Result: The winch should operate smoothly, free
of hesitation or binding.
Test Two-Speed Winch Operation
1 Install a load handling attachment.
2 Shift the winch to the slow speed.
3 Raise the carriage by firmly grasping the winch
handles and rotating
them towards the
mast.
Result: The winch
should operate
smoothly, free of
hesitation or binding.
4 Lower the carriage by
firmly grasping the
winch handles and rotating them away from the
mast. After lowering to the desired position, turn
the winch handles toward the mast (raise the
load)
1
/4 turn to set the brake.
Result: The winch should operate smoothly, free
of hesitation or binding.
5 Shift the winch to the fast speed and repeat
steps 3 and 4.
Test Mast Sequencing
1 Install a load handling attachment.
2 Raise the carriage to full height by firmly
grasping the winch handles and rotating them
towards the mast.
Result: The carriage should raise to the top of
the front mast section, followed in consecutive
order by each mast section.
3 Fully lower the carriage. After lowering to the
desired position, turn the winch handles toward
the mast (raise the load)
1
/4 turn to set the
brake.
down
up
down
up
Page view 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 25 26

Comments to this Manuals

No comments