Genie Z-34 User Manual Page 14

  • Download
  • Add to my manuals
  • Print
  • Page
    / 40
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 13
Operator's Manual Fourth Edition • Third Printing
12 Z-34/22 IC Part No. 1000048
PRE-OPERATION INSPECTION
Pre-operation Inspection
R Be sure that the operator's, safety and
responsibilities manuals are complete, legible
and in the storage container located on the
platform.
R Be sure that all decals are legible and in place.
See Decals section.
R Check for engine oil leaks and proper fluid
level. Add oil if needed. See Maintenance
section.
R Check for engine coolant leaks and proper fluid
level. Add coolant if needed. See Maintenance
section.
R Check for hydraulic oil leaks and proper oil level.
Add oil if needed. See Maintenance section.
R Check for battery fluid leaks and proper fluid
level. Add distilled water if needed. See
Maintenance section.
R Check for proper tire pressure. Add air if
needed. See Maintenance section.
Check the following components or areas for
damage, improperly installed or missing parts and
unauthorized modifications:
R Electrical components, wiring and electrical
cables
R Hydraulic power unit, reservoir, hoses,
fittings, cylinders and manifolds
R Generator, belts and related components
R Fuel and hydraulic tanks
R Drive and turntable motors and torque hubs
R Boom wear pads
R Tires and wheels
R Engine and related components
R Limit switches
R Nuts, bolts and other fasteners
R Platform entry mid-rail/gate
R Beacon and alarms (if equipped)
Check entire machine for:
R Cracks in welds or structural components
R Dents or damage to machine
R Be sure that all structural and other critical
components are present and all associated
fasteners and pins are in place and properly
tightened.
R After you complete your inspection, be sure that
all compartment covers are in place and
latched.
Page view 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 39 40

Comments to this Manuals

No comments