Genie TMZ-19 User Manual Page 20

  • Download
  • Add to my manuals
  • Print
  • Page
    / 37
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 19
18 Genie TMZ-34/19 Part No. 97866
Operator's Manual Fourth Edition • First Printing
MAINTENANCE
Scheduled Maintenance
Maintenance performed quarterly, annually and
every two years must be completed by a person
trained and qualified to perform maintenance on this
machine according to the procedures found in the
service manual for this machine.
Machines that have been out of service for more
than three months must receive the quarterly
inspection before they are put back into service.
Check the Batteries
Proper battery condition is essential to good
performance and operational safety. Improper fluid
levels or damaged cables and connections can
result in component damage and hazardous
conditions.
This procedure does not need to
be performed on machines with
sealed or maintenance-free
batteries.
Bodily injury hazard. Batteries
contain acid. Avoid spilling or
contacting battery acid. Neutralize
battery acid spills with baking soda
and water.
1 Put on protective clothing and eye wear.
2 Be sure that the battery cable connections are
tight and free of corrosion.
3 Be sure that the battery hold-down brackets are
secure.
4 Remove the battery vent caps.
5 Check the battery acid level. If needed,
replenish with distilled water to the bottom of the
battery fill tube. Do not overfill.
6 Install the vent caps.
Page view 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 ... 36 37

Comments to this Manuals

No comments