Genie TZ-50 User Manual Page 33

  • Download
  • Add to my manuals
  • Print
  • Page
    / 41
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 32
Part No. 114164 Genie TZ-50 31
Operator's Manual
Second Edition • First Printing
Lifting Instructions
Fully lower and retract the boom.
Securely latch the boom hold-down latches.
Raise all four outriggers to the stowed position.
Remove all loose items on the machine.
Determine the center of gravity of your machine
using the table and pictures on this page. Measure
from one of the lifting points on the tongue end of
the machine.
Attach the rigging only to the designated lifting
points on the machine.
Adjust the rigging to prevent damage to the
machine and to keep the machine level.
Center of Gravity Table
X Axis Y Axis
ANSI, CSA and Australia 13.5 in 16 in
34 cm 41 cm
CE 12.4 in 16 in
31 cm 41 cm
Observe and Obey:
Only qualified riggers should rig and lift the
machine.
Be sure the crane capacity, loading surfaces
and straps or lines are sufficient to withstand
the machine weight. See the serial plate for the
machine weight.
TRANSPORT AND LIFTING INSTRUCTIONS
Tie-down
point
Lifting
point
Y axis
X axis
Chassis
Lifting
Points (2)
Chassis
Lifting
Points (2)