Genie SUPERLIFT 33547 User Manual Page 9

  • Download
  • Add to my manuals
  • Print
  • Page
    / 26
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 8
Part No. 33547 Genie Superlift Contractor 7
Operator's ManualFirst Edition • Ninth Printing
Do Not Operate Unless:
You learn and practice the principles of safe
machine operation contained in this operator's
manual.
1 Avoid hazardous situations.
2 Always perform a pre-operation
inspection.
Know and understand the pre-operation
inspection before going on to the next
section.
3 Always perform function tests prior to use.
4 Inspect the workplace.
5 Only use the machine as it was intended.
Fundamentals
The pre-operation inspection is a visual inspection
performed by the operator prior to each work shift.
This inspection is designed to discover if anything
is apparently wrong with a machine before the
operator tests it.
Refer to the list on the next page and check each
of the items.
If damage or any unauthorized variation from
factory delivered condition is discovered, the
machine must be tagged and removed from
service.
Repairs to the machine may only be made by a
qualified service technician, according to the
manufacturer's specifications. After repairs are
completed, the operator must perform a pre-
operation inspection again before going on to the
function tests.
Pre-operation Inspection
Page view 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 25 26

Comments to this Manuals

No comments