Genie SUPER HOIST 82297 User Manual Page 8

  • Download
  • Add to my manuals
  • Print
  • Page
    / 16
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 7
6 Genie Super Hoist Part No. 82297
Fourth Edition • Second PrintingOperator’s Manual
Function Tests
If any of the results listed under the following steps
are not observed or any other malfunction is
discovered, the machine must be tagged and
removed from service.
Setup
1 Select a firm, level area free of obstructions.
2 Stand the machine up on its base. Release the
leg locks one at a time and lower each leg to
the down position.
3 Firmly grasp the cylinder assembly and lift it
enough for each leg to lock into the down
position.
Result: All four leg locks should click into the
locked position.
4 Position the platform over the mounting plug and
fasten it securely with the T-nut.
5 Set the CO2 tank bracket next to the CO2 tank.
Wrap the straps around the tank and attach the
tank tightly to the bracket. Set the CO2 tank
bracket with the tank on any one of the hoist
legs.
Note: Leave the tank on the bracket until it is
necessary to change tanks.
Function Tests
Do Not Operate Unless:
You learn and practice the principles of safe
machine operation contained in this operator's
manual.
1 Avoid hazardous situations.
2 Always perform a pre-operation
inspection.
3 Always perform function tests prior to
use.
Know and understand the function tests
before going on to the next section.
4 Inspect the workplace.
5 Only use the machine as it was intended.
Fundamentals
The function tests are designed to discover any
malfunctions before the machine is put into service.
The operator must follow the step-by-step
instructions to test all machine functions.
A malfunctioning machine must never be used. If
malfunctions are discovered, the machine must be
tagged and removed from service. Repairs to the
machine may only be made by a qualified service
technician, according to the manufacturer's
specifications.
After repairs are completed, the operator must
perform a pre-operation inspection and function
tests again before putting the machine into service.
Page view 7
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Comments to this Manuals

No comments