Genie M-4700 User Manual Page 12

  • Download
  • Add to my manuals
  • Print
  • Page
    / 32
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 11
12
Position opener head so that rail is lined up with center
line of open door.
Line up hanger brackets (not provided) with ceiling joists
or framing to locate where brackets are to be fastened.
See Fig. 22.
Mark location for 5/16" lag screws (not provided), and
drill two 3/16" pilot holes.
Fasten hanger brackets to joists using lag screws.
If garage framing supports are not visible, attach a length
of perforated angle or a 2x4 to the ceiling, securing it to
the hidden joists with lag screws long enough to fasten
firmly to garage framing (extra hardware items not pro-
vided). Then, attach one end of hanger brackets to the
perforated angle or 2x4 mounted to ceiling. Attach other
end of hanger brackets to openers chassis angle iron. See
Fig. 23 for alternate mounting methods.
Once opener is securely fastened in position, remove
wood blocks and temporary supports and lower door.
Check door for proper operation and clearance by manu-
ally moving door to full open and closed position. If door
hits rail at any point, raise opener head slightly higher
and re-mount in position.
NOTE: To provide additional support for rails 13 length and
longer, use optional support bracket. (Accessories p.28)
Measure the rails overall span. Bracket is located on 1/3rd
of the overall rail span from the door header bracket end.
See Fig. 24
Place support bracket over rail (close side) on a diagonal.
Make sure support securement clamps clear rail sides.
Secure bracket onto rail by twisting support bracket as
indicated in Fig. 24A.
Attach mounting strap (not provided) to support bracket
and secure by fastening it to the ceiling.
8-7. MOUNT OPENER TO CEILING
If not properly secured, the opener
could fall and injure someone.
Secure opener to structural supports or
framing. Do not mount to drywall, plaster,
or other such material.
Fig. 22
Joists (may be
hidden behind
drywall)
Perforated
Angle
Fig. 23
Support
Bracket
1/3 (S)
1st C
Bracket
Rail Span (S)
Mounting
Strap
Fig. 24
Rail
Support
Bracket
Fig. 24A
Page view 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 31 32

Comments to this Manuals

No comments